판매가 | *견적문의 |
---|---|
할인판매가 | (0원 할인) |
최적할인가 | 원 |
할인금액 | 총 할인금액 원 (모바일할인금액 원) |
적립금 | |
제휴적립금 | |
배송방법 | 택배 |
배송비 | |
상품 추가설명 번역정보 |
구매방법 | |
---|---|
배송주기
정기배송 할인 save
|
상품 정보 | 가격 | 삭제 |
---|
할인가가 적용된 최종 결제예정금액은 주문 시 확인할 수 있습니다.
Ten sophisticated work tasks use recognizable materials to teach multi-step activities. Specific skills are practiced and important work skills and habits are developed and reinforced. Many tasks require the use of multiple parts over extended work periods.
Even though complete tasks are complex, each is broken down into small steps to accommodate users with various abilities.
** 각 품목명을 클릭하면 상세설명으로 연결됩니다. **
Details
Introduces use of industrial equipment—a heatsealer. A safety feature on the heatsealer allows heating and sealing of plastic bags, but prevents burning of fingers! Procedure involves counting, bagging, sealing and packing.
Slide metal and plastic rings on spring loaded carabiner clips, matching the ring color to the sample and placing each clip in the storage bin when completed.
A five-piece, fine-motor and tool-use task that requires inserting, turning and using a screwdriver.
Each industrial cable connector includes a base piece, large nut, plate and two screws. This complex assembly introduces the use of a hand tool and a screwdriver to assist in the assembly process.
This task requires assembly of industrial PVC faucets in exact sequence using a screwdriver. Each faucet consists of nine pieces of varying size.
This is a complex seven piece assembly requiring inserting, sequencing and turning. Assemble the flashlight and see if it works! Correctly assembled, the light goes on.
Package office supplies in divider boxes following directions (words or symbols) on order cards. A complex packaging task involving multiple parts and patterns over an extended work period.
Remove 5 pieces from a divider box and assemble into a PVC Connector. Disassemble the PVC Connector into five pieces and packaging in 5-compartment divider boxes.
Practice a 5-part assembly involving turning and inserting stills using the correct sequence and placement. Or disassemble the five parts and package with each part going into its own compartment in a 5-compartment divider box. The Connectors are made of heavy-duty PVC, metal and plastic pieces.
A complex task requiring sophisticated turning and sequencing manipulations to assemble this durable seven piece item.
A two- to 24-item sort of anodized aluminum pieces. A difficult task requiring attention to three relevant dimensions: color (silver and gold), shape (circle, square, rectangle and hexagon) and thickness (thin, medium and thick). Many variations are possible: sort by shape only, shape and color, color only, color and thickness and many more.
A weighing task using a dial-face scale and involves bagging and zipping. User weighs plates to within the required 3-5 oz., then bags, zips and stores the bagged plates.
품명 | 워크액티비티 Pre-Voc Three 직업훈련 3단계(작업평가) |
---|---|
상품코드 | P0000HFJ |
주문수량 | |
결제수단 | 카드 결제, 무통장 입금 / 공기관 후불, 적립금, 실시간 계좌이체 |
판매값 | *견적문의 |
- 선생님께서 주문하신 상품은 입금 확인후 배송해 드립니다. (공기관 후불제외)
- 보통 2~4일 걸리며, 상품 종류나 경우에 따라서는 5일 이상 지연될 수 있습니다(공휴일은 제외). 늦어지는 경우 사전에 알려드립니다.
- 외국 제품 중 수입해야 할 경우, 최대 40일까지 소요될 수 있습니다(사전에 알려드립니다).
- 산간벽지나 제주도와 같은 도서지방은 별도 추가요금이 발생될 수 있습니다.
- 상품에 따라서는 견적을 요청하거나 전화로 문의해야 하는 경우도 있으며 이경우 운송비가 별도 계산될 수 있습니다.